WhatsApp AECC

RESIDENTIAL CONSTRUCTION ESTIMATOR

Choose your city.
Start with a budget.

Indicative house-construction estimates using AECC’s standard scope and your total covered area.

Standard construction basis · Materials and labour included in the indicative rate. Select a city for your quote request; location-specific adjustments are assessed in the detailed quotation.

Planning estimate only. Final cost depends on drawings, quantities, site conditions and the agreed material and finish schedule. Basements, abnormal ground, premium finishes, external works, land cost, design/approval fees, taxes and utility connections require separate consideration. View standard scope and inclusions.

Standard estimate rates

PKR per total covered square foot
Plot sizeGrey structureComplete construction
3 Marla3,0004,600
5 Marla2,5004,300
10 Marla2,3004,100

Standard finishing is the starting allowance. Premium finishes and specific material brands are agreed in a detailed quotation. Rate basis: 27 October 2026.

CITY & COST BASIS

The location matters.

Select the city nearest your site, or enter another city. The published base rates provide a preliminary budget for your covered area. Transport, local material availability, access and site conditions are assessed in the detailed quotation.

LET’S DISCUSS YOUR REQUIREMENTS

Turn the estimate into a defined scope.

Share your drawings and preferred materials for a detailed, location-specific quotation.